![]() |
Product Availability: "Weeks" to "Days" |
Post Reply
|
| Author | |
BlackReefDesigns
Newbie
Joined: 28-May-2008 Location: San Diego, CA Status: Offline Points: 8 |
Post Options
Thanks(0)
Quote Reply
Topic: Product Availability: "Weeks" to "Days"Posted: 19-January-2009 at 3:41am |
|
Client wants me to change the wording from "Days" to "Weeks" when a product is back-ordered. Where in the .ASP structure would I make that change?
Thanks Edited by BlackReefDesigns - 19-January-2009 at 4:34am |
|
|
Joe S.
BlackReef.net |
|
![]() |
|
Greg Dinger
Certified ProductCart Developers
Joined: 23-September-2006 Location: United States Status: Offline Points: 238 |
Post Options
Thanks(0)
Quote Reply
Posted: 19-January-2009 at 10:58am |
|
Have you looked in the includes/languages.asp file?
|
|
![]() |
|
Post Reply
|
|
|
Tweet
|
| Forum Jump | Forum Permissions ![]() You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |